Ciria C660 Excel Spreadsheet Now

| Sewer Section | Pipe Size (mm) | Pipe Material | Gradient | Invert Level (m) | | --- | --- | --- | --- | --- | | 1-2 | 150 | PVC | 1:100 | 10.5 | | 2-3 | 200 | Clay | 1:50 | 11.2 |

| Adoption Status | Date | Correspondence | | --- | --- | --- | | Submitted | 2023-03-01 | Email to local authority | | Approved | 2023-03-15 | Adoption letter received | ciria c660 excel spreadsheet

| Inspection/Test | Date | Time | Status | | --- | --- | --- | --- | | Pre-construction inspection | 2023-01-20 | 10:00 | Complete | | Construction phase inspection | 2023-02-10 | 12:00 | Pending | | Sewer Section | Pipe Size (mm) |

| Date | Time | Activity | Results | Defects/Issues | | --- | --- | --- | --- | --- | | 2023-02-01 | 10:00 | CCTV inspection | Passed | None | | 2023-02-05 | 12:00 | Pressure testing | Failed | Leaking joint | ciria c660 excel spreadsheet