-wms- Adnoc Pdf — Work Management System

- Weekly and daily scheduling windows (ADNOC common practice) - Coordination with operations for system/plant availability - Integrated scheduling with Turnarounds (TA) & Shutdowns

- A – Typical Work Order Coding Structure (ADNOC) - B – Priority Matrix (Safety, Production impact) - C – Job Safety Analysis (JSA) Template - D – Abbreviations and Definitions Sample Content (Page 1 – Executive Summary Style) 1. Introduction

3.1 High-Level Process Flow 3.2 Interfaces with Other Systems (ERP, CMMS, Digital Twin) work management system -wms- adnoc pdf

| OE Pillar | WMS Contribution | |-----------|------------------| | HSE | PTW, risk assessment, SIMOPS, LOTO | | Asset Management | Preventive & predictive maintenance planning | | Continuous Improvement | Work feedback loop and KPI monitoring | | Competency | Role-based WMS training and assurance |

- Technical report & as-maintained data - Feedback loop into maintenance strategy - KPIs data capture (Schedule compliance, backlog) - Weekly and daily scheduling windows (ADNOC common

- Permit to Work (PTW) process (cold, hot, confined space) - Isolation management (LOTO – Lock Out Tag Out) - Real-time progress tracking

- Planned work percentage (Target: >85%) - Schedule compliance (Target: >90%) - Backlog trend (weeks of work) - PTW turnaround time - Rework percentage Introduction 1

2.1 Lifecycle Asset Management 2.2 HSE First: Permit to Work (PTW) Integration 2.3 Reliability Centered Maintenance (RCM) 2.4 Competency Assurance

5.1 Common PTW workflow (Issuing Authority, Performing Authority) 5.2 Simultaneous Operations (SIMOPS) Management 5.3 Gas test and safety requirements

6.1 Use of Maximo / SAP PM (typical ADNOC CMMS) 6.2 Mobile Workforce Management (Tablet-based job packs) 6.3 Dashboard & Analytics (Power BI / ADNOC Panorama) 6.4 Future: AI for predictive work scheduling

This content is tailored to reflect the typical rigor, HSE focus, and asset management standards of ADNOC (Abu Dhabi National Oil Company). 1. Introduction 1.1 Purpose of the WMS 1.2 Scope (Upstream, Downstream, Refining, Petrochemicals) 1.3 Alignment with ADNOC’s Operational Excellence (OE) System